Monday 14 March 2011

It's all systems go

There is so much going on it's hard to know where to start!

The tiling has started in the family bathroom and our ensuite. This is not a very good photo, but I think the black tiles look fantastic. I love it!


The painter has started in Rachels bedroom and it looks brighter.

And best of all, when I arrived this morning at 10:30, the lights and the heat were on. And Trevor and Roger our electricians were there too, so we did a tour and double checked everything. The light I have picked for the outside above the patio is too small - so I need to have another go at it. Anyway, here is a blurry photo of our kitchen lights. It probably seems silly to get excited about it, but we've been waiting for so long and we are delighted.

The wood buring fire comes tomorrow as does the kitchen, although it's not being fitted til Wednesday. In addition to all of that there are joiners putting on doors and men outside building paths and steps. Hope there are no more hail storms on the way and that the sunny weather is here to stay.

No comments:

Post a Comment